System Test Engineer

Lucent Technologies
North Andover, MA
June 1999November 1999 (6 months)

  • Physically tested prototype fiber optic transmission blades including inserting and removing blades from rack to rack and rewiring with optical cable
  • Troubleshot possible causes for test failures
  • Created and maintained test plans
  • Automated testing with scripts and thus increasing productivity